Thorium molten-salt reactorsThorium molten-salt reactors

PROBLEM 01 Moving

No thorium molten-salt reactor has bred more fuel than it burns or made grid power, though some steps have been shown.

A small Chinese test reactor, fuelled mainly by enriched uranium, has turned some thorium into uranium-233. China aims for a 100 MWt demonstration by 2035. In Europe, Copenhagen Atomics now plans its first critical experiment for 2028, and Thorizon aims to build a demonstrator by then. The continuous salt processing a breeder needs has not yet run on any reactor.

A thorium molten-salt reactor dissolves its fuel in a hot fluoride salt, and the same salt carries the heat out. Thorium can't sustain a chain reaction by itself. It has to catch a neutron and decay, through protactinium-233, into uranium-233, which can. That protactinium step has a half-life of about 27 days. One well-known design is the LFTR, or liquid-fluoride thorium reactor.

Oak Ridge ran its 8 MWt Molten-Salt Reactor Experiment (MSRE) from 1965 to 1969. It ran first on 33%-enriched uranium-235, then became the first reactor fuelled by uranium-233. That U-233 was bred elsewhere, from thorium in other reactors. The salt held no thorium, and the reactor never tried to breed. The US breeder program was cancelled in 1973, revived, then ended in 1976.

China's 2 MWt test reactor, TMSR-LF1, took on thorium in October 2024. In November 2025 its operators reported thorium turning into uranium-233 inside it. Still, no thorium molten-salt reactor has bred more fuel than it burns, or made grid power. The main hurdles are fuel processing, metals, tritium, lithium-7 supply and licensing.[1, 2, 3, 4, 8, 10, 11, 12, 16]

Why it matters

  • ~4×

    Thorium is about four times as common as uranium in Earth's crust. Average continental crust holds about 5.6 ppm thorium against 1.3 ppm uranium. Published estimates of the ratio run from three to five.[16, 17, 18]

  • All fertile

    Natural thorium is essentially all thorium-232, which can be bred into fuel. Only about 0.7% of natural uranium is fissile U-235. A working thorium breeder could, in principle, use nearly all of its thorium.[3, 7, 16]

  • 34 kPa vs 15 MPa

    A pressurised water reactor keeps its coolant at about 15 MPa so it won't boil. MSRE's salt sat under helium at about 34 kPa gauge, because the salt barely evaporates even at 650°C.[1, 34]

  • 44%

    Fluoride salt stays liquid up to about 1400°C without pressurisation, so a plant can run hot. Oak Ridge's breeder design aimed for about 44% net efficiency. Today's water-cooled reactors turn about a third of their heat into electricity.[2, 8, 34]

  • 1.39 Mt

    Geoscience Australia estimates about 1,391,000 tonnes of thorium in the ground in Australia (Inferred, end of 2024). About 84% sits in monazite in heavy mineral sands.[18]

What's in the way

BottleneckHow it's tackled nowWhat would change it
Online fuel processing A thermal thorium breeder must pull protactinium-233 and fission products out of the running salt. Left in the core, protactinium soaks up neutrons before it can become uranium-233. Oak Ridge showed the chemistry only in lab-scale tests, using molten bismuth that attacks most metals. No such system has yet run on a reactor. China's test reactor converts only a little thorium (conversion ratio about 0.1). A remotely maintained processing loop running for years beside a working reactor. China plans full reprocessing for a 100 MWt demonstration, due about 2035.[2, 3, 8, 10]
Metals that survive the salt Plain corrosion was tiny. Over three years, MSRE's salt picked up only as much chromium as a 5 µm layer of its Hastelloy-N held. The problem was fission-product tellurium, which caused shallow cracks along grain boundaries. In lab tests, adding 1–2 atomic % niobium cut the cracking sharply. Keeping the salt chemically reducing (U4+/U3+ below about 60) essentially stopped it in those tests. Years of in-reactor data on the improved alloys, which must also resist helium embrittlement from neutrons. Plus code approval for decades of high-temperature service.[1, 3, 4, 5]
Tritium Neutrons hitting lithium in the salt make tritium, which seeps through hot metal walls. A 1972 review put a 1000 MWe breeder at about 89 TBq a day. That is roughly 50–60 times a light-water reactor, though heavy-water reactors make more. Options studied include coatings, extra intermediate loops and removing it with the off-gas. Oak Ridge later reported that its fluoroborate coolant salt could trap tritium. Capture proven at full power that keeps tritium out of the steam cycle and the stack.[3, 4]
Lithium-7 supply Natural lithium is about 92.5% lithium-7. The rest is lithium-6, which soaks up neutrons and readily makes tritium. Reactor salt needs lithium-7 at up to 99.995% purity. Only Russia and China supply it commercially. Russia's NCCP meets up to 80% of world demand for lithium-7 hydroxide. The US stopped making it in 1963 and has banned the mercury-based COLEX process. In 2026 Natura's MSR-1 received 2 tonnes of MSRE's leftover coolant salt. ORNL called it the only near-term US supply in quantity. Mercury-free enrichment outside Russia and China, big enough to supply tens of tonnes per reactor. Kairos Power has its own enrichment process, according to WNA, and planned a New Mexico salt plant for 2026.[9, 31, 32, 41]
Starter fuel Thorium can't start itself, so every design needs a fissile driver: enriched uranium, plutonium or uranium-233. China's test reactor runs on uranium enriched to under 20%. Copenhagen Atomics plans low-enriched uranium, Thorizon needs HALEU, and Flibe Energy is in talks to use surplus plutonium. Steady HALEU supply at scale, or a reactor that breeds enough uranium-233 to start the next one.[2, 8, 10, 16, 23, 26]
Graphite moderator life Graphite changes shape under neutron bombardment, faster than Oak Ridge first expected. 1960s planners expected to replace the whole two-fluid reactor vessel after about eight years. The later single-fluid design planned new core graphite about every four years. Thorizon plans a core of cartridges swapped every five to ten years. Copenhagen Atomics uses heavy water as the moderator instead. Graphite grades that last longer at high neutron dose, or cheap, routine core swaps proven in service.[2, 3, 8, 23, 25]
Licensing and the law Almost all reactor experience is with solid fuel. In liquid fuel, fission products circulate through pumps and heat exchangers. A 1972 review flagged this as raising new safety and maintenance problems. In September 2024 the US NRC issued its first construction permit for a liquid-fuelled advanced reactor, Natura's 1 MWt MSR-1. Australian federal law bars approving or licensing a nuclear power plant. A regulator licensing a full-size liquid-fuel power plant, fuel processing included. In Australia, Parliament would have to amend the EPBC and ARPANS Acts.[3, 8, 19, 20]
Used salt and waste MSRE's leftover fuel salt shows the problem. It was drained into tanks and froze when the reactor shut down in 1969. Radiolysis slowly made fluorine and uranium hexafluoride, and uranium was confirmed to be migrating in 1994. Most of the uranium was removed in 2004–2008. In 2026 the salt was still in its tanks, awaiting decommissioning. A stable, accepted waste form for used fluoride fuel salt, and a repository willing to take it.[36, 40]

Why not just…?

The questions people ask first. Open any of them.

If Oak Ridge ran one in the 1960s, why aren't they everywhere?

MSRE proved molten salt, pumps and graphite could run reliably for years. But it held no thorium, never bred, and dumped its heat to the air. A 1972 government review judged the breeder's hard parts unsolved. Money went to the sodium-cooled fast breeder instead, and the program ended in 1976.[1, 2, 3, 4]

Isn't thorium proliferation-proof?

No. The IAEA ranks uranium-233 with highly enriched uranium as direct-use material, and 8 kg counts as a significant quantity. Bred U-233 carries some U-232, whose decay chain emits a hard 2.6 MeV gamma from thallium-208. That makes it harder to handle and easier to detect. But pulling protactinium-233 out and letting it decay gives almost pure U-233.[7, 14, 15]

Why not just put thorium in normal reactors?

It's been done. Shippingport's water-cooled breeder ran on thorium and U-233 in 1977–1982 and ended with 1.39% more fissile fuel. The catch is recycling. Thorium oxide barely dissolves in nitric acid, the hydrofluoric acid fix corrodes steel, and U-232 forces remote handling. Without recycling, most of thorium's resource advantage is lost.[3, 6, 7, 16]

Why not just run it on thorium alone?

Thorium-232 isn't fissile, so it can't start a chain reaction. It must absorb a neutron and turn, via protactinium-233, into uranium-233. Every thorium reactor therefore needs a starter of enriched uranium, plutonium or U-233. China's test reactor runs mostly on uranium enriched to under 20%, with about 50 kg of thorium.[2, 10, 16]

What happens if it leaks?

The salt isn't pressurised, so a leak dribbles rather than flashing to steam. MSRE's fuel salt froze below about 434°C, so a spill turns solid. It's still intensely radioactive, and gases like xenon and krypton leave the salt anyway. MSRE held them in charcoal beds for about 7 days (krypton) to 90 days (xenon) before release.[1]

Is it really walk-away safe, with that freeze plug?

MSRE had no mechanical valves in its salt lines, just plugs of salt kept frozen by cooling air. Lose that air for long and the fuel drains to tanks where, away from the graphite, it can't go critical. But draining doesn't stop decay heat: MSRE's drain tanks had water-cooled tubes for up to 100 kW. A 1972 review said big plants would need always-ready cooling for megawatts of it.[1, 3]

Can you really refuel it while it's running?

Yes, in small doses. MSRE topped up enriched uranium in capsules during power runs. One run took 18 capsules, about 1.5 kg of U-235, in seven days. In April 2025 Nuclear Engineering International reported that TMSR-LF1 took fuel in October 2024 without a shutdown. It cited project science lead Xu Hongjie at a closed academy meeting. In November 2025, SINAP's deputy director said the design allows refuelling without shutdown.[1, 10, 12]

Doesn't thorium make less nuclear waste?

Partly. The thorium cycle makes far less plutonium and other long-lived heavy elements than uranium fuel does. But fission still makes highly radioactive fission products. Standard thorium reprocessing also sends protactinium into the waste, adding long-term radioactivity.[16]

Could Australia build one?

Not under current law. The EPBC Act (s140A) and ARPANS Act (s10) bar approving or licensing a nuclear power plant. They also bar fuel fabrication, enrichment and reprocessing plants. The only exemption is for propulsion plants in conventionally armed, nuclear-powered submarines. NSW, Victoria and Queensland have their own bans. In May 2026 NSW's upper house passed a bill to repeal the NSW ban. In late October 2026 it was still waiting for its second reading in the lower house, and lapses on 28 November 2026. Both federal bans were still in force in November 2026.[19, 20, 21, 38, 39]

Australia's got heaps of thorium. Why don't we mine it?

Geoscience Australia puts our in-ground thorium at about 1.39 million tonnes. Most sits in monazite, a minor mineral in heavy mineral sands, which are already mined. The thorium isn't recovered because there's no market for it. GA sees reactor-fuel use as decades away.[18]

Are the new US molten-salt reactors thorium reactors?

Not the ones being built. Kairos Power's Hermes uses solid fuel pebbles cooled by FLiBe salt, so its fuel isn't dissolved at all. Natura's MSR-1 dissolves HALEU uranium in its salt. Terrestrial Energy's IMSR burns standard low-enriched uranium. Flibe Energy's thorium LFTR is still a design.[8, 28, 30]

Why is China ahead?

China's Academy of Sciences launched a dedicated thorium molten-salt program in January 2011, with a reported US$350 million start-up budget. Its test reactor went critical in October 2023. The US program had stopped in 1976. Natura's MSR-1, the first US liquid-fuelled advanced reactor with an NRC construction permit, was still being built in September 2026.[4, 8, 10, 42]

Dead ends

  1. 1946–1961

    Nuclear-powered bomber program (Aircraft Nuclear Propulsion)

    Molten-salt reactors began as aircraft engines. Oak Ridge's Aircraft Reactor Experiment ran for nine days in 1954, at up to 2.5 MWt, with outlet salt up to 860°C. The program was cancelled in March 1961 after about US$1 billion. No aircraft ever flew on nuclear power.[2, 33]

  2. 1960–1968

    Two-fluid thorium breeder

    Keeping thorium in its own blanket salt needed graphite tubes as plumbing inside the core. Graphite changed shape under radiation faster than expected, and one failed tube could mean a new core and vessel. Oak Ridge switched to a single-fluid design in 1968. Flibe Energy's LFTR revives the two-fluid idea.[2, 8]

  3. Cancelled January 1973; revived 1974; ended 1976

    US Molten-Salt Breeder Reactor program

    A 1972 government review found unsolved problems in alloys, tritium control and remote maintenance. Fuel processing had never run on a reactor. Funding was tied up in the sodium-cooled fast breeder. Oak Ridge's proposals for US$350 million (1972) and US$720 million (1974) were both rejected. Lab fixes for tellurium cracking came too late for reactor tests.[3, 4, 5]

  4. 1977–1982

    Shippingport Light Water Breeder Reactor

    It ran at 60 MWe and produced more than 2.1 TWh of electricity. It showed a water-cooled thorium and uranium-233 core could breed. It ended with 1.39% more fissile fuel than it started with. But the fuel was never reprocessed, so the thorium cycle was never closed.[6, 7]

  5. Fort St Vrain 1976–1989; THTR-300 1983–1989

    Thorium in gas-cooled power reactors

    The US Fort St Vrain (330 MWe) and Germany's THTR-300 (300 MWe) both ran on thorium-bearing fuel. THTR-300 was shut down after technical problems, and Fort St Vrain also closed in 1989.[7]

Who's working on it

  • SINAP, Chinese Academy of Sciences (China)

    TMSR-LF1: a 2 MWt liquid-fuel test reactor at Wuwei, Gansu. Fuel is uranium enriched to under 20%, plus about 50 kg of thorium, in FLiBe salt with 99.95% lithium-7.

    Critical 11 Oct 2023; full power (650°C) June 2024; thorium first loaded Oct 2024. SINAP announced thorium-to-U-233 conversion on 1 Nov 2025. Director Dai Zhimin targets a 100 MWt demonstration by 2035. IEEE Spectrum reported a planned 10 MWe unit, due by 2030. NEI Magazine reported in April 2025 that ground had been broken for it.[8, 10, 11, 12, 13]

  • Department of Atomic Energy (India)

    A three-stage plan that ends in thorium. Stage two is the 500 MWe sodium-cooled Prototype Fast Breeder Reactor at Kalpakkam. It burns uranium-plutonium MOX fuel, with thorium blankets planned later. Not a molten-salt reactor.

    First criticality 6 April 2026. No commercial operation date had been set as of April 2026. The thorium-fuelled third-stage reactor (AHWR) had not been formally launched as of August 2025.[7, 22, 35]

  • Copenhagen Atomics (Denmark)

    A shipping-container-sized 100 MWt molten-salt reactor, moderated by unpressurised heavy water. Fuel salt: lithium, thorium and low-enriched uranium fluorides.

    Its first critical experiment, at Switzerland's Paul Scherrer Institute, will run low-enriched uranium salt. Power is capped at 1% of the commercial design, and runtime at 30 days. The date slipped from 2026–27 to 2028. PSI's test facility was still to be built in 2026.[8, 23, 24]

  • Thorizon (Netherlands/France)

    Thorizon One: 250 MWt / 100 MWe. Its fuel salt blends thorium with long-lived waste elements taken from spent reactor fuel. The core comes as replaceable cartridges, changed every five to ten years.

    An April 2026 Dutch agreement targets building a non-power 'Pioneer' demonstrator at Petten by 2028. It also aims to build the first commercial unit, Thorizon One, in Zeeland by 2034. Thorizon and Urenco agreed in October 2026 to look at HALEU supply for it.[8, 25]

  • Flibe Energy (USA)

    LFTR design: two-fluid and graphite-moderated, with uranium in the fuel salt and thorium in a separate blanket salt. 100–250 MWe, 650°C outlet, supercritical CO2 power cycle.

    Still at the design stage. In May 2026 DOE picked it for negotiations on using surplus plutonium as reactor fuel.[8, 26]

  • Natura Resources with Abilene Christian University (USA)

    MSR-1: a 1 MWt research reactor with a graphite moderator. HALEU uranium is dissolved in FLiBe salt. Uranium-fuelled, not thorium.

    NRC construction permit September 2024. Signed a DOE Reactor Pilot Program agreement in December 2025. Still under construction in September 2026, when 2 tonnes of old MSRE coolant salt arrived for its fuel salt.[8, 27, 28, 41, 42]

  • Terrestrial Energy (Canada/USA)

    IMSR: an integral molten-salt reactor burning standard low-enriched uranium (2–4% U-235) in fluoride salt. The current design is 195 MWe per reactor. Uranium-fuelled, not thorium.

    Canadian pre-licensing review phase 2 finished April 2023. The US NRC approved two key topical reports in 2025–26. DOE pilot agreement January 2026. In June 2026 it leased a 77-acre site at Texas A&M's RELLIS campus for a planned commercial plant. First plants targeted for the early 2030s.[8, 27, 29, 43]

  • Kairos Power (USA)

    Hermes: a 35 MWt non-power test reactor. Solid TRISO fuel pebbles (19.75% enriched uranium) are cooled by FLiBe salt near atmospheric pressure. The fuel is not dissolved in the salt, and it is not a thorium reactor.

    Under construction at Oak Ridge. In May 2026 the NRC extended its construction deadline from 31 Dec 2026 to 30 Apr 2029. Hermes 2, up to 50 MWe for TVA's grid, broke ground in April 2026.[8, 30, 31, 37]

Sources

  1. Experience with the Molten-Salt Reactor Experiment (Haubenreich & Engel), Nuclear Applications & Technology vol. 8 · American Nuclear Society (archived copy: openmsr MSR archive) · 1970
  2. Molten-Salt Reactors: History, Status, and Potential (Rosenthal, Kasten & Briggs), Nuclear Applications & Technology vol. 8 · American Nuclear Society (archived copy: openmsr MSR archive) · 1970
  3. WASH-1222: An Evaluation of the Molten Salt Breeder Reactor · US Atomic Energy Commission (archived copy: openmsr MSR archive) · 1972-09
  4. The Molten Salt Reactor Adventure (H. G. MacPherson), Nuclear Science and Engineering vol. 90 · American Nuclear Society (copy hosted by moltensalt.org) · 1985
  5. ORNL/TM-6002: Status of Tellurium–Hastelloy N Studies in Molten Fluoride Salts (J. R. Keiser) · Oak Ridge National Laboratory (archived copy: openmsr MSR archive) · 1977-10
  6. Measured breeding in a light water breeder reactor (Tessler et al., Transactions of the American Nuclear Society vol. 55) · OSTI / American Nuclear Society · 1987
  7. Thorium · World Nuclear Association · 2026-10-23
  8. Molten Salt Reactors · World Nuclear Association · 2026-10-28
  9. Lithium · World Nuclear Association · 2026-10-23
  10. Chinese molten salt reactor achieves conversion of thorium-uranium fuel · World Nuclear News · 2025-11-04
  11. China achieves 1st thorium-to-uranium fuel conversion in molten salt reactor (China Daily, reposted) · Shanghai Institute of Applied Physics, Chinese Academy of Sciences · 2025-11-03
  12. China refuels thorium reactor without shutdown · Nuclear Engineering International (NEI Magazine) · 2025-04-22
  13. Why China Is Building a Thorium Molten-Salt Reactor · IEEE Spectrum · 2024-12-30
  14. U-232 and the Proliferation-Resistance of U-233 in Spent Fuel (Kang & von Hippel), Science & Global Security vol. 9 · Science & Global Security · 2001
  15. Proliferation warnings on nuclear 'wonder-fuel', thorium (Open University release on Ashley et al., 'Thorium fuel has risks', Nature vol. 492, p. 31) · ScienceDaily · 2012-12-05
  16. IAEA-TECDOC-1450: Thorium Fuel Cycle, Potential Benefits and Challenges · International Atomic Energy Agency · 2005
  17. Composition of the Continental Crust (Rudnick & Gao), Treatise on Geochemistry vol. 3 · Elsevier (author copy, University of Maryland) · 2003
  18. Australia's Energy Commodity Resources 2026: Uranium and Thorium · Geoscience Australia · 2026
  19. Environment Protection and Biodiversity Conservation Act 1999 (Cth), s 140A (Compilation No. 70, compilation date 24 August 2026; latest version, viewed 11 Nov 2026) · Federal Register of Legislation (legislation.gov.au) · 2026-08-24
  20. Australian Radiation Protection and Nuclear Safety Act 1998 (Cth), s 10 (Compilation No. 15, compilation date 14 October 2024; latest version, viewed 11 Nov 2026) · Federal Register of Legislation (legislation.gov.au) · 2024-10-14
  21. Nuclear activities: prohibitions (Quick Guide) · Parliamentary Library, Parliament of Australia · 2024-05-30
  22. Prototype Fast Breeder Reactor at Kalpakkam, Tamil Nadu attains first criticality · Department of Atomic Energy, Government of India · 2026-04-07
  23. Copenhagen Atomics enlists PSI to validate reactor technology · World Nuclear News · 2024-07-01
  24. Project BALDER · Paul Scherrer Institute (PSI) · 2026
  25. Dutch agreement paves way for construction of commercial MSR · World Nuclear News · 2026-04-17
  26. Flibe Energy Selected for DOE Surplus Plutonium Utilization Program · Flibe Energy · 2026-05-27
  27. The deadline arrives: Checking in on the Reactor Pilot Program · American Nuclear Society (Nuclear News) · 2026-07-02
  28. MSR-1 (Natura Resources and ACU): reactor profile · NucNet SMR database · 2026
  29. Terrestrial Energy Reports First Quarter 2026 Results · Terrestrial Energy (via Business Wire) · 2026-05-14
  30. Regulator extends Hermes 1 reactor construction deadline · World Nuclear News · 2026-04-22
  31. Kairos Power Breaks Ground on Molten Salt Production Facility · US Department of Energy · 2024-10-03
  32. GAO-13-716: Managing Critical Isotopes: Stewardship of Lithium-7 Is Needed to Ensure a Stable Supply · US Government Accountability Office · 2013-09-19
  33. B-146759: Review of Manned Aircraft Nuclear Propulsion Program · US General Accounting Office (now Government Accountability Office) · 1963-02-28
  34. Nuclear Power Reactors · World Nuclear Association · 2026-08-05
  35. India hails defining step in nuclear programme as fast breeder reactor reaches first criticality · NucNet · 2026-04-08
  36. Decommissioning Challenges at the Molten Salt Reactor Experiment (workshop presentation) · ORNL Molten Salt Reactor Workshop 2021 · 2021
  37. Kairos Power, LLC; Hermes Test Reactor Facility: order amending Construction Permit No. CPTR-6 (Federal Register vol. 91, no. 95, doc. 2026-09880) · US Nuclear Regulatory Commission, via Federal Register (govinfo.gov) · 2026-05-18
  38. Legislative Assembly business program, 22 October 2026 (item: Uranium Mining and Nuclear Facilities (Prohibitions) Repeal Bill) · Parliament of New South Wales · 2026-10-22
  39. Australia group welcomes passing of nuclear bill in New South Wales · NucNet · 2026-05-07
  40. Oak Ridge Tour Book, March 2026: Molten Salt Reactor Experiment (MSRE) entry · US Department of Energy, Office of Environmental Management · 2026-03
  41. MSRE FLiBe arrives in Texas for reuse after decades in storage · American Nuclear Society (Nuclear News) · 2026-09-18
  42. Department of Energy Provides Rare Salt Material to Natura Resources · US Department of Energy, Office of Nuclear Energy · 2026-09-22
  43. Terrestrial Energy and Texas A&M sign agreements advancing IMSR commercial deployment and R&D projects at Texas A&M-RELLIS · Terrestrial Energy (via Business Wire) · 2026-06-17