Micro nuclear reactorsMicro nuclear reactors

PROBLEM 14 Moving

Small, movable reactors ran in the 1960s. No new microreactor is licensed for commercial use; fuel, cost, licensing and security stand in the way.

Five test reactors authorised by the US Department of Energy (DOE) went critical in mid-2026; four were microreactors. Gas, heat-pipe, sodium and water-cooled designs are under review, and the Army wants one on a base by September 2028. The microreactors' first tests ran at zero power, though, and costs are still estimates.

A microreactor is a reactor small enough to build in a factory and ship by truck, rail, sea or air. The US Department of Energy (DOE) says most designs would make 1–20 MW of heat (MWt). Its 2025 program plan uses a wider band of 0.1–50 MW of electricity (MWe), taken from a 2021 US law. The plan calls microreactors a class of very small modular reactors. Idaho National Laboratory (INL) says their electrical output is a hundredth to a thousandth of a traditional reactor's. For scale, one small modular reactor (SMR) design, X-energy's Xe-100, is rated at 80 MWe.

Designs vary. In 2021, DOE said US developers were focusing on gas cooling or heat pipes. Heat pipes are sealed tubes, often holding sodium, that carry heat out of the core passively. Others use liquid sodium, water or molten salt; see Problem 01, 'Thorium molten-salt reactors'. Most designs need HALEU fuel: uranium enriched to between 5% and 20% uranium-235. No US supplier sells it commercially yet.

The idea is old. The US military ran nine reactors in its Army Nuclear Power Program from 1957 to 1977, including the trailer-hauled ML-1. A US satellite carried a working reactor, SNAP-10A, in 1965. Between June and August 2026, five new DOE-authorised test reactors reached criticality, a self-sustaining chain reaction. The four microreactors among them first went critical in zero-power tests, which make essentially no usable energy. As of November 2026, none was licensed for commercial use.[1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18]

Why it matters

  • >US$1/kWh

    Electricity costs more than US$1/kWh in some remote Alaskan areas that depend on diesel generators, INL notes. A 2021 INL study names diesel generators as the main current competitor for microreactors.[3, 19]

  • ≤5 MWe

    Most remote Canadian communities on diesel or heavy oil need 5 MWe or less, according to Natural Resources Canada. Westinghouse's eVinci is rated at 5 MWe, or over 13 MW of high-temperature heat.[19, 20]

  • Up to 10 years

    DOE says a microreactor could run for up to 10 years without refuelling, unlike diesel generators. In the 1950s, the US Army hoped small reactors could replace diesel supply runs to Arctic radar stations.[1, 3, 21]

  • 4 containers

    BWXT says its 1.5 MWe Pele fits in four 6 m shipping containers, carried by truck or C-17 aircraft. DOE's program plan lists remote communities, mining sites, remote defence bases and disaster relief among target markets.[2, 22]

  • 10 kWe

    NASA's Kilopower concept aims to give crewed Moon or Mars bases up to 10 kWe for at least 10 years. Its KRUSTY prototype finished a 28-hour full-power test in Nevada in March 2018.[5, 23]

What's in the way

BottleneckHow it's tackled nowWhat would change it
Fuel supply: HALEU and TRISO Most designs need HALEU, enriched to 5–20% uranium-235; today's power reactors use up to 5%. Only Russia and China can make HALEU at scale, and only Russia's Tenex sells it commercially. The US banned Russian uranium imports in May 2024. US developers so far rely on limited DOE supplies. These come from blended-down highly enriched uranium and a Centrus demonstration plant in Ohio. That plant made over 1,900 kg of HALEU, as uranium hexafluoride, between October 2023 and June 2026. Many designs also use TRISO fuel: uranium kernels sealed in carbon and ceramic layers. BWXT made the TRISO for Antares' 2026 test core, and Standard Nuclear made Radiant's. New enrichment and fuel plants. In January 2026 DOE committed US$2.7 billion over ten years to US enrichment. Of that, two firms were awarded US$900 million each to build HALEU enrichment capacity. Centrus expects new HALEU capacity at its Ohio site by 2029 (company target, 2026). The US Nuclear Regulatory Commission (NRC) licensed X-energy's TRISO plant in Oak Ridge, Tennessee, in February 2026. Production there is due to start in early 2028. DOE says US HALEU demand could reach 50 tonnes a year by 2035.[4, 8, 9, 24, 25, 26, 27]
Cost per kWh at small scale A 2021 INL bottom-up study of one 1.8 MWe heat-pipe design, assuming a five-year life, estimated US$2,174/MWh (about US$2.17/kWh). INL called this prohibitively expensive for the expected markets. It stressed that the design was not meant to be cheap and the estimate was very preliminary. The initial fuel load was the biggest cost driver. An industry report from the Nuclear Energy Institute (NEI), quoted by INL, put first units at US$0.14–0.41/kWh. Some designs have grown. Oklo's Aurora went from 1.5 MWe to 75 MWe, and the Micro Modular Reactor (MMR) from 5 to 15 MWe. A planned NuScale SMR plant, the Carbon Free Power Project, was ended in November 2023. Its backers said it was unlikely to attract enough subscribers. Cheaper units through factory volume. The INL study found that cost cuts from repeat builds could widen the markets where microreactors compete. Antares says its first 30 to 40 reactors will be made at its Torrance, California, plant (2026). Aalo said in July 2026 that it was expanding into a factory of about 93,000 m².[3, 6, 7, 19, 28, 29, 30, 31, 32, 33]
Licensing The 2026 test reactors run under DOE authorisation, a staged series of agreements and safety approvals. Commercial use needs an NRC licence. The NRC denied Oklo's first application in January 2022 over gaps in its accident analysis and safety classification. It is now reviewing a construction permit for the KRONOS research reactor in Illinois. Its final safety evaluation is targeted for September 2027. The Army says the first reactor on a base under its Janus program will be regulated by the Army. Fast, predictable reviews under the NRC's Part 53 rules, issued in March 2026. They offer technology-inclusive standards and licensing in stages. In June 2025 the NRC also agreed to allow fuel loading and testing in factories, with conditions. In Canada, a vendor design review of eVinci began in June 2023. The Canadian Nuclear Safety Commission listed it as on hold in March 2026.[7, 13, 18, 34, 35, 36, 37, 38, 39]
Security and running with few staff DOE describes microreactors as self-adjusting designs that need few specialist operators. INL's 2021 cost study assumed nine staff per 1.8 MWe unit: four on site, one remote and four in security. Its authors called such small crews a contentious assumption. DOE's microreactor program is developing an automatic control system to raise automation and cut running costs. Long unattended test runs. Radiant plans to run Kaleidos at full power for at least 150 hours without operator intervention (company plan, 2026). The NRC's Part 53 rules include graded security requirements.[1, 2, 19, 26, 37, 40]
Moving a fuelled reactor Radiant trucked its Kaleidos demonstration reactor more than 1,600 km from California to Idaho in August 2026. Its fuel had gone separately, and was at INL by early July, to be loaded on site. In June 2025 the NRC agreed factories may load fuel if the module has features that prevent a chain reaction. It said modules in transit should need at least some physical measures to stop criticality. DOE says Valar Atomics' small reactor was the first airlifted on a US military C-17. Approved ways to ship fuelled modules by road, rail and sea, and perhaps by air. DOE's program plan says transport may need new kit, such as shock-absorbing containers and better shielding.[2, 14, 26, 38, 41]
Used fuel, waste and decommissioning For eVinci, Saskatchewan's 2024 plan was to remove the whole reactor, fuel and all, for processing at a licensed facility. No used fuel would be stored on site. A 2022 study in the journal PNAS compared three SMR designs with a large reactor. It estimated up to 5.5 times the volume of spent fuel per unit of energy. It linked the extra waste to neutron leakage from small cores and to reflector and coolant materials. NuScale disputed the result for its design. Old plants show the long tail: SM-1, shut in 1973, was fully dismantled only in 2026. A working take-back and disposal route for used cores, shown on real units.[10, 42, 43, 44, 45]
Siting and community acceptance A 2023 INL-led study found public doubts about microreactor costs, waste and fuel management. It said acceptance needs deeper study. Past projects drew protest: PM-3A's clean-up shipped 12,200 tonnes of contaminated rock to California, where state officials objected. The first new units are planned for national laboratory sites, Army bases and university campuses. Projects with local partners, such as the University of Illinois, which plans to use KRONOS for campus heat and power. The INL study also urged clearer public information separating microreactors from SMRs and large plants.[7, 30, 35, 36, 46, 47]
Liability and insurance In the US, the Price-Anderson Act caps operator liability and pools insurance; it now runs to the end of 2065. Sites with large reactors must carry US$500 million of private cover. For reactors under 100 MWe, the required cover is set by formula, from US$4.5 million to US$74 million. Their total liability is capped at US$560 million, with the federal government paying above the insurance up to that cap. Insurance terms that suit many small units, including ones moved between sites. Price-Anderson cover already extends to fuel transport.[48, 49]

Why not just…?

The questions people ask first. Open any of them.

Why not just keep using diesel?

Diesel is the incumbent: a 2021 INL study calls it the main current competitor. Some remote Alaskan areas that depend on diesel pay over US$1/kWh. The military claimed its PM-2A reactor in Greenland could replace 3.8 million litres of diesel with 20 kg of uranium. But INL judged one 2021 design too costly for those markets. A modified version might compete with diesel in some remote communities.[3, 19, 50]

Haven't small reactors been done before?

Yes: the US military ran nine between 1957 and 1977, and the trailer-hauled ML-1 first made power in 1962. SNAP-10A ran in orbit for 43 days in 1965, until a high-voltage fault on its spacecraft. PM-3A in Antarctica needed a crew of 25 and costly repairs. The Army dropped its truck-mounted reactor program in 1965. Today's aim is factory-built units for sale, and none is licensed for commercial use yet.[7, 10, 11, 12, 13, 47, 50]

Is it safe to put one near a town?

Designers aim for self-adjusting reactors: in 2018, KRUSTY passively controlled its fuel temperature and rode out simulated failures. Since December 2023, US small-reactor applicants may size emergency planning zones by dose. The main test is the area where an accident could give the public over 10 millisieverts (mSv) within 96 hours. Small is not automatically safe: SL-1's 1961 explosion killed three. The NRC's review of a campus reactor in Illinois runs into 2027.[1, 5, 21, 23, 35, 51]

Could it melt down?

It depends on the design and fuel: DOE says TRISO particles will not melt in commercial high-temperature reactors. In 2009 TRISO fuel set a burn-up record in a three-year test at INL. Heating tests then ran over 300 hours at up to 1,800°C, with little or no particle damage. That exceeded the worst accident conditions predicted for gas reactors. Still, SL-1 showed that one control rod, pulled out by hand, could destroy a small core.[21, 24]

What happens to the waste?

For eVinci, the 2024 Saskatchewan plan was to ship the whole used reactor, fuel and all, to a licensed facility. A disputed 2022 PNAS study looked at three SMR designs. It estimated up to 5.5 times a large reactor's spent-fuel volume per unit of energy. Clean-up can take decades: SM-1, shut in 1973, was fully dismantled only in 2026.[10, 42, 43, 44, 45]

Could someone steal the fuel?

HALEU stays below 20% uranium-235, the level at which uranium counts as highly enriched. In TRISO fuel, the uranium sits in tiny kernels sealed under carbon and ceramic layers. Sites still need guards: INL's 2021 cost study assumed four security staff per unit. A 2021 commentary on military use also raised the risk of a reactor being captured.[8, 19, 24, 50]

Why is the power so expensive per kWh?

INL's 2021 study of a 1.8 MWe design assumed nine staff for one unit. It found the first fuel load was the biggest cost driver. It estimated US$2,174/MWh (about US$2.17/kWh), while stressing the figure was very preliminary. An NEI report quoted by INL put first units at US$0.14–0.41/kWh, falling to US$0.09–0.33/kWh for later ones.[3, 19]

Why not use ordinary reactor fuel?

Most US advanced designs need HALEU to make cores smaller and run longer between refuels, DOE says. Ordinary power-reactor fuel holds up to 5% uranium-235. Some developers avoid HALEU. Last Energy's pilot uses standard low-enriched fuel in a small pressurised-water reactor. Aalo's 2026 test core used low-enriched uranium.[7, 8, 33, 52]

Why not ship it with the fuel already loaded?

Regulators are moving that way. In June 2025 the NRC agreed factories may load fuel if the module has features that prevent a chain reaction. It said modules in transit should need at least some physical measures to stop criticality. For its 2026 test, Radiant shipped Kaleidos and its fuel to Idaho separately.[26, 38, 41]

Could Australia have one?

Not for power: the federal Australian Radiation Protection and Nuclear Safety (ARPANS) Act 1998 bars licensing a nuclear power plant. The Environment Protection and Biodiversity Conservation (EPBC) Act 1999 bars approving one. NSW, Victoria and Queensland also have laws against nuclear facilities, from 1986, 1983 and 2007. In May 2026, a bill to repeal the NSW law passed the upper house and went to the lower house. Research reactors can be licensed: ANSTO's OPAL reactor at Lucas Heights holds an ARPANS Act facility licence.[53, 54, 55, 56, 57]

Is a submarine reactor the same thing?

Australian law treats them separately. The ARPANS and EPBC Act bans on nuclear power plants don't cover the propulsion plants of conventionally armed, nuclear-powered submarines. The Parliamentary Library's 2024 guide lists separate Commonwealth laws and bills, from 2023, for those submarines.[53, 54, 55]

Could one supply power after a disaster?

That is one of DOE's stated uses. INL says response teams could move units quickly to a disaster area and run them until infrastructure is repaired. BWXT's Pele, built to move by truck or aircraft, targets 2028 for powering military equipment.[1, 3, 22]

Dead ends

  1. 1958–1961

    SL-1 Army test reactor, Idaho

    The Army built SL-1 as a prototype small plant for remote Arctic radar stations. It first went critical in August 1958. On 3 January 1961, before a planned restart, it went prompt critical, a runaway chain reaction, and exploded. All three crew members died. The central control rod had been pulled out about 67 cm. Investigators found that manual withdrawal was the only explanation that fitted the evidence. The Atomic Energy Commission then ordered detailed written procedures.[11, 21]

  2. 1957–1977

    US Army mobile and portable reactors

    The US military built and ran nine reactors under the Army Nuclear Power Program from 1957 to 1977. The ML-1 travelled on an Army semi-trailer and first made power in Idaho in September 1962. It was the smallest nuclear plant then known to have made electricity. The Army abandoned its truck-mounted reactor program in 1965. A 2017 Army article said the package-reactor idea never took off as planned. SM-1 in Virginia cost about US$2 million to build; in 2021 its clean-up was expected to cost US$68 million.[10, 11, 50, 58]

  3. 1962–1979

    PM-3A nuclear plant, McMurdo Station, Antarctica

    This small pressurised-water plant at the US McMurdo Station began supplying power in 1962. Cracks in its containment vessel were welded three times. Later, leaked coolant raised fears of stress corrosion. With repairs estimated at US$1.5 million, the Navy chose a US$800,000 dismantling. The plant stopped generating in September 1972. The clean-up shipped 12,200 tonnes of contaminated rock to California and ended in 1979.[47]

  4. 2020–2022

    Oklo's first NRC licence application

    In March 2020 Oklo applied to build and run a 1.5 MWe Aurora fast reactor at INL. It was the first combined licence application for an advanced fission design that the NRC accepted for review. In January 2022 the NRC denied it, citing major gaps in its accident analysis and safety classification. The denial was without prejudice, so Oklo could reapply. Aurora has since grown to a 75 MWe design.[7, 28, 34]

  5. 2024

    Ultra Safe Nuclear Corporation (USNC)

    USNC designed the MMR, a 15 MWt (5 MWe) gas-cooled microreactor. A partnership planned one at Chalk River, Ontario, and in 2022 expected it to run in 2027. In October 2024 USNC filed for Chapter 11 bankruptcy to sell its assets. Standard Nuclear made the opening US$28 million bid for its fuel-related assets. NANO Nuclear Energy bought the MMR technology for US$8.5 million.[29, 59, 60]

  6. 2022–2025

    Saskatchewan's eVinci project (Canada)

    The Saskatchewan Research Council (SRC) and Westinghouse agreed in 2022 to site an eVinci in the province. In November 2023 the province announced C$80 million for SRC, aiming for operation by 2029. In late 2025 Westinghouse cancelled the contract as it shifted eVinci towards space, defence and government uses. SRC says it is now assessing other microreactor designs.[20, 29, 61]

Who's working on it

  • Radiant Industries (US)

    Kaleidos: a transportable 1 MWe helium-cooled microreactor with TRISO fuel. Its demonstration unit, rated at 3.5 MWt, was trucked in August 2026 to DOME, a test bed at INL.

    Radiant announced DOE approval of its final safety analysis on 29 October 2026. A DOE readiness review comes next, then fuelling. Radiant says tests will cover 60 effective full-power days, including at least 150 continuous hours without operator intervention. In March 2026, INL's schedule had it going critical in June. Radiant aims to deliver units to customers by 2028 (company target, July 2026). The Army picked it for Janus in August 2026.[18, 26, 36, 40, 41, 62]

  • Westinghouse (US)

    eVinci: a heat-pipe-cooled microreactor with TRISO fuel and a 15 MWt core, rated at 5 MWe. Westinghouse expects eight or more years between refuels.

    The NRC approved its principal design criteria report in March 2025. In June 2025, DOE approved a preliminary safety report for an eVinci test in DOME. That September, Westinghouse gave up its 2027 DOME slot. In September 2026, criticality tests at NCERC, a Nevada facility, reached a peak core temperature of 1,011°C. It joined the Army's Janus program in August 2026, after cancelling its Saskatchewan project in 2025.[36, 42, 61, 63, 64, 65]

  • BWXT (US)

    Project Pele: a 1.5 MWe high-temperature gas-cooled reactor with TRISO fuel, for the US Department of Defense's Strategic Capabilities Office. BWXT also makes TRISO fuel for other developers.

    Fuel for the first core was finished in November 2025, and the core barrel cartridge was installed in September 2026. As of November 2026, the reactor was still to ship from Lynchburg, Virginia, to INL for tests. BWXT now targets 2028 for powering military equipment; in 2024, DOE said it could run as early as 2026. The Army picked BWXT for Janus in August 2026.[22, 25, 36, 66]

  • Antares (US)

    R1: a microreactor with TRISO fuel, cooled by sodium heat pipes, aimed at defence and space uses.

    Its Mark-0 test core reached zero-power criticality at INL on 4 June 2026, the first in DOE's pilot program. On 23 October 2026, Antares announced DOE approval of the safety design agreement for Mark-1, its first power-producing reactor. Antares plans six months at full power in 2027 (company plan, October 2026). The US Air Force (April 2026) and Army (August 2026) chose it for base reactors. In September 2026 it announced a US$161 million Defense Department award to demonstrate a space version, R1-S.[6, 13, 18, 36, 67]

  • Aalo Atomics (US)

    Aalo-X: a 10 MWe sodium-cooled reactor using low-enriched uranium fuel.

    A full-scale, zero-power version reached criticality at INL early on 4 July 2026. It was the fourth DOE-authorised test reactor to do so. Aalo plans a 10 MWe unit at its INL site to make electricity in 2027 (company plan, July 2026).[16, 33]

  • Last Energy (US)

    PWR-20: a 20 MWe pressurised-water microreactor on standard low-enriched uranium fuel. Its PWR-5 pilot shares the same reactor geometry, with lower enrichment, for 5 MWe.

    DOE approved the pilot's preliminary safety analysis in May 2026. Last Energy announced DOE approval of its final safety analysis on 7 October 2026. Last Energy says the pilot, at Texas A&M's RELLIS campus, will show low-power criticality before making electricity.[18, 52]

  • NANO Nuclear Energy and University of Illinois (US)

    KRONOS MMR: a 45 MWt (15 MWe) helium-cooled reactor with TRISO fuel, developed from USNC's design. The university plans it as a research reactor supplying campus heat and power.

    The construction permit application was filed on 31 March 2026 and docketed on 18 May 2026. The NRC targets a final safety evaluation in September 2027. NANO expects construction to start in the second half of 2027 (company estimate, May 2026).[30, 35, 60]

  • US Department of Energy and INL (US)

    Runs the Reactor Pilot Program, set up after a May 2025 executive order. INL's DOME test bed takes reactors up to 20 MWt. Also building MARVEL, an 85 kWt (about 10 kWe) test microreactor cooled by sodium-potassium.

    Four DOE-authorised test reactors went critical by 4 July 2026, beating a goal of three. Antares was first, on 4 June, then Valar Atomics' 100 kWt Ward 250 in Utah on 18 June. Deployable Energy's 1 MWe Unity followed on 30 June, then Aalo on 4 July. A fifth, Oklo's 15 MWt isotope test reactor in Texas, went critical on 5 August. On 30 September 2026, INL named Deployable as the next DOME user. INL expects MARVEL to go critical in 2027 and reach full power in 2028.[7, 13, 14, 15, 16, 17, 62, 65, 68]

  • US Army and Department of Defense (US)

    Janus: contractor-owned and -operated microreactors on Army bases, run with the Defense Innovation Unit. The department's Strategic Capabilities Office separately leads the Pele project.

    On 26 August 2026 the Army picked Antares, BWXT, General Atomics, Radiant and Westinghouse for five bases. It is awarding up to US$2.2 billion over fiscal years 2027–2031 and expects more than 20 reactors. The target is a first reactor running on a base by September 2028, regulated by the Army.[22, 36, 66]

  • Saskatchewan Research Council (Canada)

    A provincial research agency that ran a SLOWPOKE-2 research reactor for 38 years. It aims to license and demonstrate Saskatchewan's first microreactor, for remote northern areas.

    Westinghouse cancelled the eVinci contract with SRC in late 2025. SRC's latest public update (undated) says it is assessing other microreactor technologies, with no new site or date.[29, 61]

Sources

  1. What is a Nuclear Microreactor? · US Department of Energy, Office of Nuclear Energy · 2021-02-26
  2. A Microreactor Program Plan for the Department of Energy, Revision 4 (INL/EXT-20-58919) · Idaho National Laboratory for the US Department of Energy Microreactor Program · 2025-05
  3. Microreactors (INL topic page; undated, accessed 18 November 2026) · Idaho National Laboratory · 2026-11-18
  4. TRISO-X Receives NRC Special Nuclear Material License for Advanced Fuel Fabrication Facility · US Department of Energy, Office of Nuclear Energy · 2026-02-25
  5. Demonstration proves nuclear fission system can provide space exploration power (news release NR-18-0011) · NNSA Nevada Field Office · 2018-05-02
  6. Antares achieves zero-power criticality at INL · American Nuclear Society (Nuclear Newswire) · 2026-06-05
  7. The deadline arrives: Checking in on the Reactor Pilot Program · American Nuclear Society (Nuclear Newswire) · 2026-07-02
  8. HALEU Frequently Asked Questions (last updated 30 December 2025) · US Department of Energy, Office of Nuclear Energy · 2025-12-30
  9. High-Assay Low-Enriched Uranium (HALEU) (updated 26 October 2026) · World Nuclear Association · 2026-10-26
  10. Deactivated Nuclear Power Plant Program (presentation by G. Komp and H. Honerlah) · US Army Corps of Engineers, Baltimore District (copy hosted by the Texas Low-Level Radioactive Waste Disposal Compact Commission) · 2014-07-10
  11. Proving the Principle: A History of the Idaho National Engineering and Environmental Laboratory (online flipbook page on the SL-1 aftermath and ML-1) · Idaho National Laboratory · 2000
  12. System for Nuclear Auxiliary Power (SNAP) Overview · US Department of Energy, Energy Technology Engineering Center · 2023-10-18
  13. Department of Energy Celebrates First Advanced Reactor Criticality · US Department of Energy · 2026-06-04
  14. Department of Energy Celebrates Second Advanced Reactor Achieving Criticality · US Department of Energy · 2026-06-18
  15. U.S. Department of Energy Meets President Trump's Goal, Delivers Third Advanced Reactor Criticality · US Department of Energy · 2026-07-01
  16. Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal · US Department of Energy · 2026-07-06
  17. Office of Nuclear Energy Celebrates Fifth Advanced Reactor Criticality · US Department of Energy, Office of Nuclear Energy · 2026-08-06
  18. Antares, Last Energy, and Radiant hit DOE authorization milestones · American Nuclear Society (Nuclear Newswire) · 2026-11-02
  19. An Economics-by-Design Approach Applied to a Heat Pipe Microreactor Concept (INL/EXT-21-63067), Abou-Jaoude et al. · Idaho National Laboratory · 2021-07
  20. Government of Saskatchewan Funds Microreactor Research · Saskatchewan Research Council · 2023-11-27
  21. Proving the Principle: A History of the Idaho National Engineering and Environmental Laboratory, chapter 15 (the SL-1 reactor) · Idaho National Laboratory · 2000
  22. Project Pele: Rapid, Deployable Nuclear Power (page last modified 10 November 2026) · BWX Technologies · 2026-11-10
  23. Kilopower Reactor Using Stirling TechnologY (KRUSTY) Nuclear Ground Test Results and Lessons Learned (NASA/TM-2018-219941), Gibson et al. · NASA · 2018-10-01
  24. TRISO Particles: The Most Robust Nuclear Fuel on Earth · US Department of Energy, Office of Nuclear Energy · 2019-07-09
  25. BWXT Manufactures TRISO Fuel Enabling First New Reactor Criticality Under DOE Program · BWX Technologies (via Business Wire) · 2026-06-04
  26. Five Phase Testing Program Targets More Than 150 Hours at Full Power Without Operator Intervention · Radiant Industries · 2026-07-01
  27. U.S. Department of Energy Awards $2.7 Billion to Restore American Uranium Enrichment · US Department of Energy · 2026-01-05
  28. NRC denies Oklo licence application · World Nuclear News · 2022-01-07
  29. Canadian MoUs advance microreactor deployment · World Nuclear News · 2022-05-19
  30. Microreactor application accepted for review by US regulator · World Nuclear News · 2026-05-21
  31. Pre-Application Activities for the Carbon Free Power Project (page last updated 11 February 2025) · US Nuclear Regulatory Commission · 2025-02-11
  32. Utah Associated Municipal Power Systems (UAMPS) and NuScale Power Agree to Terminate the Carbon Free Power Project (CFPP) (joint press release, exhibit to NuScale Power Form 8-K) · NuScale Power and UAMPS (via SEC EDGAR) · 2023-11
  33. Aalo Atomics achieves criticality on July 4 · American Nuclear Society (Nuclear Newswire) · 2026-07-06
  34. NRC Denies Oklo Combined License Application for Lack of Information; Company May Reapply in the Future (news release 22-002) · US Nuclear Regulatory Commission · 2022-01-06
  35. University of Illinois Urbana-Champaign: KRONOS Micro Modular Reactor (KRONOS MMR) application review page (last updated 14 September 2026) · US Nuclear Regulatory Commission · 2026-09-14
  36. Army reaches agreement with private industry for nuclear micro-reactors · US Army (army.mil) · 2026-08-26
  37. NRC Unveils First New Reactor Licensing Process in Decades to Speed Deployment While Maintaining Safety (news release 26-035) · US Nuclear Regulatory Commission · 2026-03-25
  38. Staff Requirements Memorandum, SECY-24-0008: Micro-Reactor Licensing and Deployment Considerations: Fuel Loading and Operational Testing at a Factory · US Nuclear Regulatory Commission · 2025-06-17
  39. Vendor design review (current reviews table; page modified 3 March 2026) · Canadian Nuclear Safety Commission · 2026-03-03
  40. Radiant Achieves Industry Milestone as the Only Microreactor Design to Secure DOE Safety Analysis Approval for Full Power Operations · Radiant Industries via Business Wire (repost on Offshore Source) · 2026-10-29
  41. Radiant's Reactor Is En Route to The INL DOME · Radiant Industries · 2026-08-12
  42. Saskatchewan Research Council partners with Westinghouse to deploy the first-of-a-kind microreactor · Saskatchewan Research Council · 2024-02
  43. Nuclear waste from small modular reactors (L. M. Krall, A. M. Macfarlane and R. C. Ewing), PNAS 119(23): e2111833119 · Proceedings of the National Academy of Sciences · 2022-05-31
  44. [UPDATED] Researchers Say SMRs Will Produce More Waste Than Large Nuclear Reactors, NuScale Disputes Claim · POWER Magazine · 2022-06-10
  45. Army announces the complete dismantlement of SM-1 · American Nuclear Society (Nuclear Newswire) · 2026-09-14
  46. New study examines US markets for microreactors · Idaho National Laboratory · 2023-05-15
  47. Atomic energy for Antarctica: the rise and fall of 'Nukey Poo' (H. E. F. Nielsen), Polar Record 60 · Cambridge University Press · 2024-09-20
  48. Price-Anderson Act: Nuclear Power Industry Liability Limits and Compensation to the Public After Radioactive Releases (IF10821, M. Holt) · Congressional Research Service (copy via EveryCRSReport) · 2025-02-28
  49. Backgrounder on Nuclear Insurance and Disaster Relief · US Nuclear Regulatory Commission · 2025-07
  50. The US Army tried portable nuclear power at remote bases 60 years ago: it didn't go well (P. Bierman) · The Conversation · 2021-07-20
  51. Emergency Preparedness for Small Modular Reactors and Other New Technologies (final rule, 88 FR 80050) · US Nuclear Regulatory Commission (Federal Register, via GovInfo) · 2023-11-16
  52. Last Energy Receives DOE Approval of PWR-5 Preliminary Documented Safety Analysis · Last Energy · 2026-05-28
  53. Australian Radiation Protection and Nuclear Safety Act 1998, Compilation No. 13 (s 10 and s 13) · Federal Register of Legislation (Australian Government) · 2023-07-04
  54. Environment Protection and Biodiversity Conservation Act 1999 (Cth), s 140A (consolidated text; accessed 18 November 2026) · AustLII · 2026-11-18
  55. Prohibitions on nuclear activities in Australia (Quick Guide, E. Gibson) · Parliamentary Library, Parliament of Australia · 2024-05-30
  56. Australian state of New South Wales considers lifting uranium ban · MINING.COM · 2026-05-07
  57. Inspection report: ANSTO OPAL reactor, 28 and 29 June 2023 (facility licence F0157) · Australian Radiation Protection and Nuclear Safety Agency (ARPANSA) · 2023
  58. Pioneer in military use of nuclear power provides insight on facility to be decommissioned · US Army (army.mil) · 2017-09-26
  59. Ultra Safe Nuclear Corporation (USNC) Files Chapter 11 Petition to Facilitate Sale · Ultra Safe Nuclear Corporation · 2024-10-29
  60. NANO Nuclear Energy Inc., Form 8-K (asset purchase agreement with Ultra Safe Nuclear Corporation) · US Securities and Exchange Commission (EDGAR) · 2024-12-26
  61. FAQs About Nuclear (SRC Nuclear additional information; undated, accessed 18 November 2026) · Saskatchewan Research Council · 2026-11-18
  62. National Reactor Innovation Center: Partnering with industry to deploy advanced nuclear at the speed of a startup (A. Collins, presentation) · Idaho National Laboratory, National Reactor Innovation Center · 2026-03-05
  63. Westinghouse eVinci Microreactor Achieves Criticality Milestone · US Department of Energy, Office of Nuclear Energy · 2026-09-16
  64. Westinghouse news, eVinci items: NRC approval of Principal Design Criteria topical report (31 March 2025); DOE approval of eVinci test reactor PSDR for NRIC-DOME (3 June 2025) · Westinghouse Electric Company · 2025-06-03
  65. Deployable Energy next in line for testing in NRIC's DOME · American Nuclear Society (Nuclear Newswire) · 2026-10-02
  66. Department of Defense Breaks Ground on Project Pele Microreactor · US Department of Energy, Office of Nuclear Energy · 2024-09-24
  67. DOD funds $161 million space reactor award · American Nuclear Society (Nuclear Newswire) · 2026-09-15
  68. MARVEL Microreactor (INL project page; undated, accessed 18 November 2026) · Idaho National Laboratory · 2026-11-18