Fusion powerFusion power
Laser fusion now releases more energy than its lasers put on target, but no machine has yet made net electricity.
Laser fusion passed a target gain of one in December 2022 and reached 4.13 in April 2025. Magnetic machines set energy, duration and confinement records in 2023–25, and SPARC, BEST and ITER are being built. But no machine has yet made net electricity, and tritium breeding, wall materials and plant engineering are unproven.
Fusion joins light atomic nuclei into heavier ones and releases energy. The easiest reaction on Earth joins deuterium and tritium, two heavy forms of hydrogen. Each reaction releases 17.6 MeV, and 14.1 MeV of that leaves with a fast neutron. On Earth the fuel must reach around 150 million °C, the IAEA says. At that heat it is a plasma: a hot gas of charged particles.
There are two main ways to hold it together. Magnetic machines, such as tokamaks and stellarators, trap the plasma in strong magnetic fields for seconds to minutes. Inertial machines squeeze the fuel so fast that it fuses before it can fly apart. At the US National Ignition Facility (NIF), lasers heat a centimetre-sized hollow cylinder, whose X-rays crush a peppercorn-sized fuel capsule. The laser pulse lasts a few billionths of a second.
"Gain" can mean different things. Scientific gain, or Q, compares the fusion energy released with the heating put into the plasma. For laser fusion, it is measured against the laser energy that reaches the target. Engineering gain compares the electricity a plant sends out with the power it uses itself. So far only laser fusion has passed one, and only on the first measure. The best magnetic result, at JET in 1997, was Q = 0.67.[1, 2, 3, 4, 5, 6, 7, 8]
Why it matters
- ≈4 million×
Per kilogram of fuel, fusion releases nearly four million times the energy of burning coal or oil, the IAEA says. That is about four times as much as fission.[1]
- 33 g/m³
Seawater holds about 33 g of deuterium per cubic metre, ITER says, so that half of the fuel is plentiful. Tritium, the other half, occurs naturally only in tiny traces.[9]
- US$14.24 billion
Fusion companies had received this much funding by July 2026, says the Fusion Industry Association's survey of 56 firms. About US$0.98 billion of it was public money, and US$4.48 billion came in the year to July 2026.[10]
- 2039
That is when ITER, the international machine being built in France, plans to start deuterium–tritium operation. Its 2024 re-plan moved this from 2035, and a European Commission report still gave 2039 in October 2026.[11, 12]
- 8.6 MJ
NIF's best shot, in April 2025, made 8.6 MJ from 2.08 MJ of laser light on target (gain 4.13). For its first ignition shot, NIF drew about 300–400 MJ from the grid, LLNL said in 2023.[3, 8]
What's in the way
| Bottleneck | How it's tackled now | What would change it |
|---|---|---|
| Tritium fuel | Tritium for fusion research comes mainly from CANDU heavy-water reactors in Ontario, Canada. ITER puts the world's stock at about 20 kg. A 2018 study used an unofficial estimate of 12.3 kg for ITER's total needs. Power plants must breed their own tritium by hitting lithium with fusion neutrons. ITER and China's BEST plan to test breeding blanket modules. | A blanket that breeds more tritium than the plant burns, proven inside a working fusion machine. ITER says it will be the first fusion machine to test the idea.[9, 13, 14, 15] |
| Neutron damage | D–T fusion neutrons carry about 14 MeV, against about 2 MeV in fission. They damage the walls and structures around the plasma. Fission reactors cannot easily mimic these neutrons for testing. IFMIF-DONES, an accelerator-based neutron source in Granada, Spain, is being built to test materials under fusion-like conditions. | Years of test data from IFMIF-DONES to qualify wall materials. Site works for its main building began in August–September 2026; the building is due to be largely finished by 2029.[2, 16, 17, 18, 19] |
| Heat exhaust | The divertor is the plasma's exhaust, where escaping heat and particles strike the wall. ITER expects its divertor targets to take about 10 MW/m² steadily and 20 MW/m² in slow transients. That is about ten times the heating on a spacecraft re-entering the atmosphere, ITER says. WEST and EAST test tungsten divertors in long pulses. | Divertors that survive power-plant heat loads for years, not minutes.[4, 20] |
| Disruptions and runaway electrons | A plasma can collapse suddenly, and the collapse can create beams of fast electrons that damage the wall. ITER chose shattered pellet injection: frozen neon and deuterium pellets fired in to end the plasma in a controlled way. | Proof that this works at full current. A 2024 modelling study found no acceptable runaway-electron case for ITER's 15 MA D–T plasmas.[21, 22] |
| Magnets | Stronger fields allow smaller machines. MIT and CFS reached 20 tesla in a large high-temperature superconducting magnet on 5 September 2021. SPARC's magnets of this type run at about −253°C; ITER's low-temperature superconducting magnets run at −269°C. CFS installed the first of SPARC's 18 main magnets in January 2026. | Reliable magnets at plant scale, made from cheaper superconducting tape.[23, 24, 25] |
| Laser efficiency and firing rate | NIF's lasers are pumped by flashlamps. Only about 0.5% of the energy it draws from the grid ends up as laser light on target. NIF fires about 400 shots a year. In April 2026, a planned upgrade from 2.2 MJ to 2.6 MJ of laser energy passed a design approval. | LLNL staff said in 2023 that a plant needs 10–20% efficient lasers firing about 10 times a second. It would also need a target gain near 100.[8, 26, 27, 28] |
| Running continuously | Plasma-facing parts must last without shedding material into the plasma. EAST held a high-confinement plasma for 1,066 seconds in January 2025. WEST held a plasma for 1,337 seconds on 12 February 2025. In May 2025 Wendelstein 7-X held a record triple product (density × temperature × confinement time) for 43 seconds. That made it joint leader with JET for long pulses. | Months of continuous operation between maintenance stops.[2, 4, 29] |
| Licensing | Fusion makes radioactive tritium and turns machine parts radioactive. In February 2026 the US NRC proposed regulating fusion machines under its byproduct-material rules, not as fission reactors. No final rule had been published by November 2026. In June 2026 Washington state licensed Helion's Orion site to hold radioactive materials and release radioactive air emissions. | Final rules, and the first full licences for power plants, in each country.[30, 31] |
Why not just…?
The questions people ask first. Open any of them.
Why not use deuterium–deuterium fuel, from seawater alone?
Each D–D reaction releases only 3–4 MeV, against 17.6 MeV for D–T. D–D also needs a much hotter, better-confined plasma. Published estimates put the conditions it needs at roughly 40 to 70 times harder to reach than for D–T. It still makes neutrons, though less energetic ones.[2, 5, 32]
Why not helium-3 or proton–boron fuel?
Helion plans D–He-3 fuel and will make its own helium-3, which is scarce on Earth, from D–D reactions. TAE plans hydrogen–boron fuel for its Da Vinci plant. A 2022 review found D–He-3 needs conditions about 18 times harder to reach than D–T. Proton–boron needs around 100 keV, over 1 billion °C. Helion's February 2026 result used D–T fuel.[5, 33, 34, 35]
Has anyone made net energy yet?
Only on the narrowest measure. NIF's best shot released 4.13 times the laser energy that reached the target. But for its first ignition shot, NIF drew about 300–400 MJ from the grid to make 3.15 MJ. No magnetic machine has passed Q = 1, and no fusion machine has yet made net electricity.[2, 3, 6, 7, 8]
Isn't fusion always 30 years away?
Public programmes still plan on long timelines. ITER plans D–T operation from 2039, and the UK's STEP prototype aims to run by about 2040. In the FIA's 2026 company survey, 32 of 45 respondents expected commercial fusion electricity by 2040. Only 16 picked 2031–35, down from 21 a year earlier. These are forecasts, not results.[2, 10, 11, 36]
Why not just scale up NIF?
NIF was built to prove the physics, not to make power. It fires about 400 shots a year; a plant would need about 10 a second. Only about 0.5% of the energy it draws from the grid ends up as laser light on target. LLNL staff said in 2023 that a plant needs lasers 10–20% efficient and a target gain near 100.[8, 26, 27]
Is it radioactive, and can it melt down?
Fusion makes radioactive tritium, and its neutrons make machine parts radioactive. But there is no chain reaction to run away. If control is lost, the fusion reactions stop by themselves, the US NRC says. ITER says only a few grams of fuel are in the plasma at any moment. The NRC proposes regulating fusion like other radioactive materials, not like fission reactors.[1, 9, 30]
Why use tritium if it's so rare?
D–T is the easiest fusion reaction to achieve with today's technology. But world stocks are only about 20 kg, by ITER's estimate. ITER's figures imply a 1,000 MW plant would burn over 100 kg of tritium a year. So a power plant must breed its own tritium from lithium.[2, 9, 14]
Why build ITER if private firms are faster?
ITER aims for Q = 10: 500 MW of fusion power from 50 MW of heating, in 400-second pulses. It will also test breeding blankets and run a plant's systems together at scale. Many private designs build on public research: Proxima's on Germany's Wendelstein 7-X, CFS's on decades of tokamak work. ITER also shares its software and design data with private firms.[11, 14, 23, 37, 38]
Could a fusion plant make weapons material?
Tritium has nuclear-weapons uses, so the US controls its export, and a fusion machine could make a lot of it. Fusion machines don't use or make nuclear material such as uranium or plutonium. But their neutrons could be used to irradiate such material, which would bring in international safeguards. NIF itself mainly supports US nuclear weapons research.[2, 30]
How much fuel does a fusion plant burn?
ITER says a 1,000 MW coal-fired power station burns about 2.7 million tonnes of coal a year. A fusion plant with the same electrical output would need about 250 kg of fuel, half deuterium and half tritium. JET's record 69 MJ pulse in October 2023 used 0.2 mg of fuel.[7, 9, 39]
Why must the magnets be superconducting?
Copper magnets lose power as heat. JET's copper magnets drew about 150 MW, and ITER says copper versions of its magnets would need about 800 MW. Superconductors carry current with no resistance, but must be kept very cold: ITER's run at −269°C. CFS's high-temperature superconducting magnets run at about −253°C, and one reached 20 tesla in 2021.[23, 24, 25, 40]
What will fusion electricity cost?
No one knows yet, because no fusion power plant has run. CFS estimated in January 2026 that its first ARC plant would cost several billion US dollars. In the FIA's 2026 survey, 27 of 42 respondents expected a commercially viable plant by 2040. Fifteen expected that later.[2, 10, 24]
Dead ends
- 1958
ZETA's fusion claim (UK)
On 24 January 1958 the ZETA team at Harwell announced it had probably seen fusion neutrons. Less than four months later, they accepted the neutrons came from plasma instabilities, not thermonuclear fusion.[41]
- 1986
Mirror Fusion Test Facility (US)
LLNL finished MFTF-B, a large magnetic mirror machine, in 1986 at a cost of US$372 million at the time. It was mothballed on its dedication day and never ran experiments. With fusion budgets shrinking, tokamaks were judged the better bet.[42]
- 1996–1997
- 2016–2024
ITER's original schedule
The 2016 plan had a brief first-plasma test in 2025. The 2024 re-plan moved research operation to 2034 and D–T operation to 2039. In July 2024 ITER's director-general put the extra cost at about €5 billion. The ITER Council endorsed the new plan's approach in November 2024.[11, 45, 46]
- 2025
First Light Fusion's power-plant plans (UK)
First Light Fusion fired projectiles at fuel targets instead of using lasers. On 3 March 2025 it dropped plans to build a power plant and cancelled Machine 4, its planned ignition demonstrator. It said it would instead supply targets using its amplifier technology to other firms.[47]
Who's working on it
-
ITER Organization (international, in France)
Tokamak. Building ITER, which aims for ten times more fusion power than heating power (Q = 10) with D–T fuel.
The 2024 baseline plans research operation from 2034 and D–T operation from 2039. In November 2025 the ITER Council said the project was slightly ahead of that schedule and spending less than planned.[11, 38, 48]
-
Lawrence Livermore National Laboratory (US)
Laser-driven inertial fusion at NIF.
As of September 2026, LLNL listed 11 ignition shots, the latest on 20 June 2026. The best, on 7 April 2025, yielded 8.6 MJ. In April 2026 a planned upgrade to 2.6 MJ of laser energy passed a design approval.[3, 28]
-
Commonwealth Fusion Systems (US)
Compact tokamak with high-temperature superconducting magnets. Building SPARC in Devens, Massachusetts, and planning its ARC power plant in Virginia.
Installed the first of SPARC's 18 main magnets in January 2026, and in July 2026 said it was finishing assembly. Targets net fusion gain in SPARC in 2027 and ARC power in the early 2030s (company targets).[10, 24, 49]
-
Helion (US)
Pulsed field-reversed configuration: two plasmas are fired together, merged and squeezed by magnets. Building Orion at Malaga, Washington, targeting at least 50 MW of electricity.
On 13 February 2026 it reported measurable D–T fusion and 150 million °C in its Polaris machine. Asked in February 2026 whether Helion had reached scientific breakeven, its CEO did not say. Washington state licensed the Orion site in June 2026. Helion aims to supply Microsoft from 2028 (company target).[31, 33, 35, 50]
-
TAE Technologies (US)
Field-reversed configuration designed for hydrogen–boron fuel. Plans Da Vinci, a 50 MWe plant.
January 2026 company targets for Da Vinci: first plasma 2029, net energy 2030 and power 2031. Its merger with Trump Media & Technology Group, agreed in December 2025, goes to a shareholder vote on 14 December 2026.[34, 51]
-
UK Fusion Energy, part of the UKAEA group (UK)
Spherical tokamak. Developing STEP, a prototype plant at the former West Burton power station in Nottinghamshire. It aims for over 100 MW of net electricity.
Operation is targeted for around 2040. The delivery company was renamed UK Fusion Energy in March 2026. That month, a consortium led by Kier and Nuvia was named construction partner for the first phase of site works.[2, 36, 52, 53]
-
Institute of Plasma Physics, Chinese Academy of Sciences (China)
Superconducting tokamaks. Building BEST in Hefei, a D–T machine aiming for Q ≥ 1 by the end of 2030, then towards Q ≈ 5.
Its first main component, the dewar base, was installed in October 2025. Completion is targeted for the end of 2027, with first plasma in late 2027 or early 2028. Its EAST tokamak set the 1,066-second record in January 2025.[4, 15, 54]
-
Proxima Fusion (Germany)
Stellarator: twisted magnets hold the plasma without needing a current inside it. Published its Stellaris plant concept in February 2025.
Raised €411 million (about US$468 million) in July 2026. Targets Alpha, a net-energy demonstrator near Munich, for the early 2030s (company target).[2, 37, 55]
-
General Fusion (Canada)
Magnetised target fusion: a magnetised plasma squeezed by a collapsing lithium liner. Operating its LM26 machine near Vancouver.
Cut about a quarter of its staff in May 2025 amid a funding crunch. Its shares began trading on Nasdaq in July 2026. In 2026 it reported heating plasma to about 8.4 million °C. It aims for a first plant around 2035 (company target).[2, 56, 57, 58]
-
IFMIF-DONES (Spain, with EU, Croatian, Italian and Japanese partners)
Accelerator-based neutron source to test fusion materials. Not a power plant.
Site works for its main building began in August–September 2026. The building is due to be largely complete by 2029.[17, 18, 19]
Sources
- World Survey of Fusion Devices 2022
- Nuclear Fusion Power
- Achieving Fusion Ignition
- Achievements at EAST and WEST
- Progress toward fusion energy breakeven and gain as measured against the Lawson criterion (Wurzel and Hsu), Physics of Plasmas 29, 062103
- History of Fusion
- Energy record JET
- IAEA Webinar Explores NIF's Ignition and Energy Gain Breakthroughs
- Fuelling
- The Global Fusion Industry in 2026
- Press conference summary: presentation by Pietro Barabaschi, ITER Director-General, on the proposed 2024 baseline
- Interim evaluation of the European Joint Undertaking for ITER and the Development of Fusion Energy, COM(2026) 528 final
- Tritium resources available for fusion reactors (Kovari et al.), Nuclear Fusion 58, 026010
- Tritium breeding
- BEST Research Plan, 1st Edition: Missions and Pathways to Realisation (v1.1)
- International materials facility IFMIF-DONES starts construction phase
- Europe signs its first Procurement Arrangements for IFMIF-DONES
- DONES Steering Committee approves key frameworks for programme implementation and international cooperation and notes the advancement of the construction works on-site
- IFMIF-DONES construction enters a new phase with the start of site works
- Divertor
- A task force to face the challenge
- Runaway electron dynamics in ITER disruptions with shattered pellet injections (Vallhagen et al.), Nuclear Fusion 64, 086033
- MIT-designed project achieves major advance toward fusion energy
- Commonwealth Fusion Systems installs reactor magnet, lands deal with Nvidia
- Magnets
- The commercial drive for laser fusion power
- Efficiency Improvements
- NNSA and LLNL Advance Laser Upgrade for Nuclear Stockpile Mission Ahead of Schedule
- Wendelstein 7-X sets world record for long plasma triple product
- Regulatory Framework for Fusion Machines (proposed rule), 91 FR 9476
- Helion clears key regulatory milestone on the path to building and operating the world's first fusion power plant
- Introduction to Fusion Ignition Principles: Zeroth Order Factors of Fusion Energy Research (H. Xie; English translation of a 2023 USTC Press book)
- Fusion startup Helion hits blistering temps as it races toward 2028 deadline
- Trump Media & Technology Group, Form 425 (TAE Technologies Q&A and investor presentation)
- Helion Achieves New Industry-First Fusion Energy Milestones, Accelerating Path to Commercial Fusion
- New company takes over UK's STEP fusion programme
- Proxima Fusion and Partners Publish Stellaris Fusion Power Plant Concept to Bring Limitless, Safe, Clean Energy to the Grid
- 37th ITER Council Meeting: ITER maintains strong project execution
- Fusion research facility JET's final tritium experiments yield new energy record
- Superconductivity: it gets the current flowing (ITER Mag 5)
- How the 'Zeta fiasco' pulled fusion out of secrecy
- Mirror Fusion Test Facility
- 10th anniversary of end of operations: TFTR tokamak
- TFTR DT experiments (Strachan et al.), Plasma Physics and Controlled Fusion 39, B103–B114
- ITER fusion reactor hit by massive decade-long delay and €5bn price hike
- Support for baseline approach
- First Light Fusion switches strategy, drops plans to develop power plant
- The implications of the new ITER schedule
- Commonwealth Fusion Systems Raises Another $1 Billion, Bringing Total Capital Raised to $4 Billion
- Helion announces world's first fusion energy purchase agreement with Microsoft
- Trump Media & Technology Group and TAE Technologies Announce Effectiveness of Form S-4 Registration Statement for Proposed Merger
- UK Atomic Energy Authority strategy 2026 to 2030
- UK fusion boom with Kier JV on £200M plant, £45M supercomputer and tritium facility supplier
- China Achieves Milestone in Compact Fusion Project with Key Component Installation
- Proxima Fusion Raises €411 Million to Build Europe's Commercial Fusion Champion
- General Fusion lays off staff due to 'unexpected and urgent financing constraints'
- General Fusion Completes Business Combination with Spring Valley Acquisition Corp. III
- General Fusion Provides First Public Company Business Update